Free printable electrician punch list template for rough-in, trim-out, and final walk-through electrical inspections. Download, print, and use on any job.
| Done | Inspection item | Status | Notes / Assigned to |
|---|---|---|---|
| All boxes installed at correct heights | |||
| Box fill calculations verified | |||
| Wiring method approved for location | |||
| Wire gauge correct for circuit amperage | |||
| Stapling / fastening every 4 ft and within 12 in of box | |||
| MC/BX connectors installed properly | |||
| Grounding conductors properly sized | |||
| Junction boxes accessible and covered | |||
| Smoke detector rough-in locations marked | |||
| AFCI / GFCI locations noted on plan | |||
| Panel location roughed in with correct clearances | |||
| Service entrance / meter base roughed in | |||
| Low-voltage rough-ins (data, AV, security) complete | |||
| All penetrations firestopped |
| Done | Inspection item | Status | Notes / Assigned to |
|---|---|---|---|
| Panel properly labeled with circuit schedule | |||
| Neutral and ground bars properly separated | |||
| Double-tapping buss bars — none present | |||
| Breaker amperage matches wire gauge | |||
| AFCI breakers installed per code | |||
| GFCI protection for required circuits | |||
| Main disconnect accessible | |||
| Grounding electrode system installed | |||
| Service entrance cable properly secured | |||
| Meter can inspection passed |
| Done | Inspection item | Status | Notes / Assigned to |
|---|---|---|---|
| All outlets and switches installed and tested | |||
| GFCI outlets test correctly (test/reset functional) | |||
| Arc-fault outlets or breakers test correctly | |||
| All outlets have correct polarity | |||
| Light fixtures installed and operational | |||
| Ceiling fan boxes rated for fan support | |||
| Exhaust fans vented to exterior | |||
| Smoke detectors interconnected and tested | |||
| CO detectors installed per code | |||
| Outdoor fixtures rated for wet/damp locations | |||
| All cover plates installed — no missing plates | |||
| Electrical panel cover installed | |||
| Final megohm / insulation resistance test (if required) |
| Done | Inspection item | Status | Notes / Assigned to |
|---|---|---|---|
| All debris removed from work area | |||
| Wire scraps disposed of properly | |||
| Penetrations patched or caulked | |||
| All temporary wiring removed | |||
| As-built markups delivered to GC |
Verify every item above is checked and photo-verified before signing.