Electrician Punch List Template

Free printable electrician punch list template for rough-in, trim-out, and final walk-through electrical inspections. Download, print, and use on any job.

Rough-In Electrical

DoneInspection itemStatusNotes / Assigned to
All boxes installed at correct heights
Box fill calculations verified
Wiring method approved for location
Wire gauge correct for circuit amperage
Stapling / fastening every 4 ft and within 12 in of box
MC/BX connectors installed properly
Grounding conductors properly sized
Junction boxes accessible and covered
Smoke detector rough-in locations marked
AFCI / GFCI locations noted on plan
Panel location roughed in with correct clearances
Service entrance / meter base roughed in
Low-voltage rough-ins (data, AV, security) complete
All penetrations firestopped

Panel & Service

DoneInspection itemStatusNotes / Assigned to
Panel properly labeled with circuit schedule
Neutral and ground bars properly separated
Double-tapping buss bars — none present
Breaker amperage matches wire gauge
AFCI breakers installed per code
GFCI protection for required circuits
Main disconnect accessible
Grounding electrode system installed
Service entrance cable properly secured
Meter can inspection passed

Devices & Fixtures

DoneInspection itemStatusNotes / Assigned to
All outlets and switches installed and tested
GFCI outlets test correctly (test/reset functional)
Arc-fault outlets or breakers test correctly
All outlets have correct polarity
Light fixtures installed and operational
Ceiling fan boxes rated for fan support
Exhaust fans vented to exterior
Smoke detectors interconnected and tested
CO detectors installed per code
Outdoor fixtures rated for wet/damp locations
All cover plates installed — no missing plates
Electrical panel cover installed
Final megohm / insulation resistance test (if required)

Cleanup & Punchout

DoneInspection itemStatusNotes / Assigned to
All debris removed from work area
Wire scraps disposed of properly
Penetrations patched or caulked
All temporary wiring removed
As-built markups delivered to GC

Completion & Sign-Off

Verify every item above is checked and photo-verified before signing.

Inspector signature
Date
Owner / GC acceptance
Date