Plumbing Punch List Template

Free printable plumbing punch list template for underground, rough-in, top-out, trim, and final inspection sign-off on new construction and renovations.

Underground / DWV

DoneInspection itemStatusNotes / Assigned to
Pipe slope: 1/4 in per ft on 3-in or smaller, 1/8 in per ft on 4-in+
Cleanouts installed at required intervals
Pipe bedding material correct
All connections glued / joined properly
Pressure test or ball test passed
Sleeve through foundation wall installed
Final inspection by AHJ before backfill

Rough-In Plumbing

DoneInspection itemStatusNotes / Assigned to
All supply stubs at correct heights per fixture schedule
Hot on left, cold on right at all fixtures
Drain, waste, and vent (DWV) roughed in per plan
All vent pipes penetrate roof — no tie-ins at wrong locations
All pipe penetrations firestopped
Water service properly sleeved through foundation
PRV (pressure reducing valve) installed if required
Water hammer arrestors at washing machine and dishwasher
Stub-outs capped and pressure-tested (100 psi, 15 min)
Pipe hangers within 12 in of each joint and every 4 ft on horizontal runs

Fixture Trim & Final

DoneInspection itemStatusNotes / Assigned to
All fixtures installed and secured
Toilets: properly sealed to flange, no movement
Lavatories: drain and P-trap properly installed
Kitchen sink: strainer basket, drain, and disposal connected
Dishwasher: high-loop or air gap installed
Showers: pan liner / waterproofing tested before tile
Tub and shower valves: covers trimmed, escutcheons tight
Water heater: TPR valve installed and piped to floor
Water heater: expansion tank installed if closed system
Hose bibs: vacuum breakers installed
All shutoff valves operational
No visible leaks after 48-hour observation
Water pressure tested — meets local code minimum
Final walk-through with owner complete

Gas (if applicable)

DoneInspection itemStatusNotes / Assigned to
Gas line properly sized
Pressure test passed (30-min hold)
Earthquake shutoff valve installed (required jurisdictions)
Drip leg at each appliance
Gas range / dryer hookup complete and leak-tested
Permit final signed off

Completion & Sign-Off

Verify every item above is checked and photo-verified before signing.

Inspector signature
Date
Owner / GC acceptance
Date