Free printable plumbing punch list template for underground, rough-in, top-out, trim, and final inspection sign-off on new construction and renovations.
| Done | Inspection item | Status | Notes / Assigned to |
|---|---|---|---|
| Pipe slope: 1/4 in per ft on 3-in or smaller, 1/8 in per ft on 4-in+ | |||
| Cleanouts installed at required intervals | |||
| Pipe bedding material correct | |||
| All connections glued / joined properly | |||
| Pressure test or ball test passed | |||
| Sleeve through foundation wall installed | |||
| Final inspection by AHJ before backfill |
| Done | Inspection item | Status | Notes / Assigned to |
|---|---|---|---|
| All supply stubs at correct heights per fixture schedule | |||
| Hot on left, cold on right at all fixtures | |||
| Drain, waste, and vent (DWV) roughed in per plan | |||
| All vent pipes penetrate roof — no tie-ins at wrong locations | |||
| All pipe penetrations firestopped | |||
| Water service properly sleeved through foundation | |||
| PRV (pressure reducing valve) installed if required | |||
| Water hammer arrestors at washing machine and dishwasher | |||
| Stub-outs capped and pressure-tested (100 psi, 15 min) | |||
| Pipe hangers within 12 in of each joint and every 4 ft on horizontal runs |
| Done | Inspection item | Status | Notes / Assigned to |
|---|---|---|---|
| All fixtures installed and secured | |||
| Toilets: properly sealed to flange, no movement | |||
| Lavatories: drain and P-trap properly installed | |||
| Kitchen sink: strainer basket, drain, and disposal connected | |||
| Dishwasher: high-loop or air gap installed | |||
| Showers: pan liner / waterproofing tested before tile | |||
| Tub and shower valves: covers trimmed, escutcheons tight | |||
| Water heater: TPR valve installed and piped to floor | |||
| Water heater: expansion tank installed if closed system | |||
| Hose bibs: vacuum breakers installed | |||
| All shutoff valves operational | |||
| No visible leaks after 48-hour observation | |||
| Water pressure tested — meets local code minimum | |||
| Final walk-through with owner complete |
| Done | Inspection item | Status | Notes / Assigned to |
|---|---|---|---|
| Gas line properly sized | |||
| Pressure test passed (30-min hold) | |||
| Earthquake shutoff valve installed (required jurisdictions) | |||
| Drip leg at each appliance | |||
| Gas range / dryer hookup complete and leak-tested | |||
| Permit final signed off |
Verify every item above is checked and photo-verified before signing.