HVAC Punch List Template

Free printable HVAC punch list template for ductwork, equipment install, startup, commissioning, and final inspection on residential and light commercial jobs.

Ductwork Rough-In

DoneInspection itemStatusNotes / Assigned to
Duct sizes match ACCA Manual D design
Ducts properly supported every 8 ft max
All duct connections taped or mastic-sealed
Insulation on supply ducts in unconditioned space
Return air path clear — no pressure-blocking doors
Bath and kitchen exhaust fans ducted to exterior
Dryer duct properly installed (metal, not plastic)
Combustion air openings per equipment requirements
All duct penetrations through fire walls sealed

Equipment Installation

DoneInspection itemStatusNotes / Assigned to
AHU / furnace clearances per manufacturer spec
Condensate drain installed with trap — no standing water
Condensate overflow pan installed under AHU
Refrigerant line set properly insulated
Refrigerant line set protected from physical damage
Condensing unit on pad — level and secured
Condenser clearance from walls, shrubs, other equipment
Electrical disconnect at condenser
Low-voltage control wiring properly labeled
Gas line properly sized, supported, and leak-tested
Combustion venting per code (material and pitch)
CO / flue gas backdraft test passed
Filter slot accessible and correctly sized

Startup & Commissioning

DoneInspection itemStatusNotes / Assigned to
Refrigerant charge verified (superheat / subcooling)
Static pressure readings within design range
All supply and return grilles installed
Thermostat wired and programmed
System test — both heating and cooling modes
Airflow balanced to each zone / room
Noise / vibration levels acceptable
Safety controls tested (high limit, pressure switches)
Emergency shutoff functional
Startup sheet filled out and attached to equipment

Final Inspection

DoneInspection itemStatusNotes / Assigned to
All access panels secured
Equipment labels and warnings intact
Homeowner walkthrough complete — system operation explained
Warranty registration submitted
Maintenance schedule left with owner
All debris and scrap materials removed
Insulation intact on all pipe and duct
Permit card signed off by inspector

Completion & Sign-Off

Verify every item above is checked and photo-verified before signing.

Inspector signature
Date
Owner / GC acceptance
Date