Cabinet Installation Punch List: 35 Items to Check Before Sign-Off
A cabinet installation punch list with 35 inspection points by phase, common defects with jobsite photos, a printable checklist, example item, and FAQs.
Written by Luke Johns · August 19, 2026 · 12 min read
Cabinetry is one of the most visible and most touched finishes in any build, which means cabinet installation defects are the defects owners notice first. A door that binds, a drawer that rubs, or a reveal that is off by a quarter inch becomes a callback the week after move-in. This cabinet installation punch list walks through 35 inspection points organized by phase — from delivery and layout to final adjustment and cleanup — so you can catch every issue before sign-off instead of after the owner does.
Run this checklist at two moments: once immediately after the cabinets are hung and set (the "rough set" walk), and again after countertops, plumbing, and electrical trim are complete (the "final" walk). Most cabinet defects are cheap to fix the day they are installed and expensive to fix once the stone is on and the appliances are in.
Delivery, Handling & Storage
All cabinets delivered match the approved shop drawings and finish schedule
No visible damage to boxes, doors, or drawer fronts from transit
Finish color and sheen match the approved sample door across all units
Cabinets acclimated to the space for the manufacturer-required time before install
All hardware (hinges, slides, knobs/pulls) accounted for and correct finish
Layout & Alignment
Cabinet layout matches the approved floor plan and appliance locations
Wall cabinets level side-to-side and front-to-back within 1/8 inch over 10 feet
Base cabinets level within 1/8 inch over 10 feet
Adjacent cabinet faces flush — no offset between adjoining boxes
Vertical reveals between cabinets equal and consistent
Gap between wall and base cabinets consistent across the run
Cabinets plumb vertically — no leaning forward or back
Corner cabinets open and close without binding on adjacent cabinets
Cabinet runs symmetrical where the design calls for symmetry
Fastening & Structural
Wall cabinets secured to studs with correct fastener count per manufacturer spec
Base cabinets anchored to wall and/or floor per spec
No fasteners driven through visible finished faces
Cabinet backs not bowed or pulled away from wall
Toe kick height consistent and level
Island cabinets secured to floor with proper blocking — no movement
Countertop support rails installed where required for span
Doors & Drawers
All doors open and close smoothly without binding or rubbing
Door gaps (reveals) consistent around each door and across the run
Doors stay closed — no pop-open from hinge tension
Drawer slides operate full extension without sticking or dropping
Drawers close flush to the face — no protrusion or recession
Soft-close mechanisms functional on all equipped doors and drawers
No exposed screw heads on hinge plates or slide mounts
Door and drawer fronts free of scratches, dents, or finish rubs
Hardware & Accessories
All knobs and pulls installed straight, level, and at consistent heights
Hardware tight — no loose knobs or spinning pulls
Pull screw length correct — no tips protruding through drawer box interior
Lazy Susans, pull-outs, and tray dividers operate smoothly
Toe-kick drawers and storage accessories functional
Under-cabinet lighting (if applicable) installed, wired, and tested
Finish, Sealing & Cleanup
All exposed edges banded or finished — no raw particleboard showing
Cabinet interiors clean — no sawdust, labels, or packaging debris
Finish uniform — no blotches, overspray, or touch-up mismatch
Sink base interior sealed per manufacturer requirement (waterproof)
Caulk joint at backsplash and wall clean and continuous
All protective film and blue tape removed
Touch-up kit provided to owner / GC
When should I run the cabinet installation punch list?
Run it twice: once right after the cabinets are hung and set (the rough-set walk), and again after countertops, plumbing, and electrical trim are complete (the final walk). Most alignment and hardware issues are easiest to fix on the rough-set walk before the stone and appliances go in.
What is an acceptable cabinet door reveal tolerance?
Reveals should be consistent within about 1/16" to 1/8" around each door and across a run of cabinets. A reveal that varies by more than 1/8" on a single door is a hinge adjustment, not a defective cabinet, and should be flagged for the installer.
Who is responsible for cabinet defects — the installer or the manufacturer?
Alignment, fastening, hardware adjustment, and finish damage from install are the installer. Finish color mismatch, warped doors, or defective hardware out of the box are the manufacturer. Document the defect with a photo at delivery so you can tell the difference later.
Should the sink base be waterproofed?
Most manufacturers require the interior of a sink base to be sealed or finished to protect against condensation and minor leaks. Check the manufacturer spec and confirm the sink base interior is sealed before sign-off.
Can I use this checklist for bathroom vanities too?
Yes. The layout, alignment, doors and drawers, hardware, and finish sections apply to bath vanities identically. Add a check that the vanity is sealed at the plumbing penetrations and that the countertop caulk joint is continuous.
Luke Johns spent a decade on job sites running punch lists, coordinating subcontractors, and closing out projects before building QuickPunch. Punch lists, subcontractor coordination, quality control, and project closeout across residential remodeling, production home building, and commercial multifamily construction. More about Luke Johns →