Trade Closeout & Walkthrough Checklist
Free interactive trade closeout and walkthrough checklist for contractors. Tick off rough-in, finish quality, and safety items in your browser, then print or save as PDF — with a QuickPunch conversion hook built in.
1. Rough-In & Prep Work
- All rough-in penetrations sealed and insulated properly
- Junction boxes flush, level, and free of debris
- Sub-floor / framing surface prepped, cleaned, and level
2. Install & Finish Quality
- Fixtures and finish materials free of scratches, dents, or paint overspray
- Grouting, caulking, and sealant lines continuous and clean
- Cover plates, trim pieces, and hardware fully secured
3. Safety & Final Testing
- All systems cycled, tested, and performing to manufacturer specs
- Labels, directories, and instruction tags attached and legible
- Work site swept clean with scrap materials cleared